--- title: "Datacenter Migration - Miami (us-mia-1) · Maintenance | CubePath" description: "We will be relocating all CubePath infrastructure in Miami (us-mia-1) to a new datacenter facility. All servers in this location will be powered down, phy…" language: en source: https://cubepath.com/status/maintenances/a12a31d8-da75-4a51-9e5e-68d216524db0 --- # Datacenter Migration - Miami (us-mia-1) [All maintenance](https://cubepath.com/status/maintenances) Completed Miami, Florida We will be relocating all CubePath infrastructure in Miami (us-mia-1) to a new datacenter facility. All servers in this location will be powered down, physically transported, and brought back online at the new site. Expected downtime is approximately 4 hours. The maintenance window is 8 hours to cover transport, racking, power-up and full verification of network and services before we declare the work complete. All services hosted in us-mia-1 (VPS, dedicated servers and network connectivity in this location) will be unavailable while the move is in progress. Your IP addresses and configurations remain unchanged, so no action or reconfiguration is required on your side. If you run critical workloads in Miami, we recommend planning around this window. Our team will post progress updates on the status page throughout the maintenance. Scheduled Start Sep 5, 2026, 08:00 UTC Scheduled End Sep 5, 2026, 16:00 UTC Affected Services - VPS - Baremetal Servers - Network ## Updates 1. Completed Sep 5, 2026, 13:13 UTC The Miami (us-mia-1) datacenter migration is now complete. All servers have been transported, racked, powered up and verified at the new facility, and network connectivity and services in this location are fully restored. Your IP addresses and configurations remain unchanged, so no action is required on your side. If you are still experiencing any issue with your service in Miami, please open a ticket at https://my.cubepath.com/tickets and our team will assist you right away. Thank you for your patience during this maintenance.